Site Supervisor- URGENT Toàn thời gian

R801, 8th floor Capital Tower, 109 Tran Hung Dao, Hoan Kiem, Hanoi
Thương lượng

Các Phúc Lợi Dành Cho Bạn

Lương tháng 13
Nghỉ phép có lương
Thưởng

Mô Tả Công Việc

Purpose

The Supervisor will work on theHanoi Pilot Light Metro Line Project (HPLMLP):
E&M package (CP07)
Power Supply & Depot Equipment (CP06)

for the following systems:
• Mechanical, HVAC system, fire alarm, firefighting, etc…
• Electrical, Power Supple and Depot Equipment

Responsibilities

Supervision of the works for CP07, including:

- Installation of insulated ducting and piping for HVAC system, and specialized package units and also

including electrical components such as fan, damper, griller, panel boxes… According to technical

specifications and shop drawing.

- Installation of pipes, tubes, fittings, and related equipment in the correct position, altitude, balance along

hanging, rack and other accessories such as valves, elbows, ... According to technical specifications.


Supervision of the works for CP06, including:

- Ensured that works are implemented smoothly and safely during the different activities such as Lifting, Installation of equipment, works at height, pulling of cables…
- Manage and ensure progress for the work and activities of Power Supply Sub-Contractor.

Yêu Cầu Công Việc

- Knowledge of HVAC systems, Split & VRV Systems, Chiller, etc
- Or knowledge of Electrical system, Equipment Installation
- 5-7 years of experience in M&E Site Supervision (work with the workers), or Equipment Installation, Cable tray & Cable Laying works.
- Good command of English

Địa Điểm Làm Việc

Công việc tương tự

Việc làm bạn sẽ thích